Convenient Construction And High Efficiency , High Bearing Capacity , Silver
1.Company introduction
Business Type: | Manufacturer, Trading Company |
Location: | Guangdong, China (Mainland) |
Main Products | Aluminum Profile,Aluminium Extrusion |
Total Employees | 301 - 500 People |
Total Annual | US$50 Million - US$100 Million |
Year Established | 1997 |
Top 3 Markets |
DomesticMarket 60.00% Southeast Asia 10.00% Eastern Asia 10.00% |
Advantages |
(1) High precision aluminums are derived from our more than 10-years experience and advanced equipment (2) customize:We can manufacture according to your size and shape of such aluminum profile (4)abundance surface treatment: powder coating, anodizing, electronic powder and so on . (5) Package: According to your requirements, such as paper package or rolled with cuttons,etc. (6) Price: Competitive price.negotiation. |
2.Introduction:
Aluminium formwork is a construction template made of aluminum alloy, also known as aluminum alloy formwork, which refers to a module made of a module, which is made by extruding a special device and consists of an aluminum panel, a bracket, and a connector. With a complete set of accessories for general use, it can be combined into different sizes of the overall shape of the complex formwork, assembly, industrial construction of the system template, to solve the traditional defects of the existing template, greatly improving the construction efficiency.
The development and application of aluminum formwork design is a major development in the construction industry.
3.Advantages:
The aluminum formwork system components need to be designed in accordance with the characteristics of the floor, which has a higher requirement for the design and technical personnel. About 80% of the modules in the aluminum formwork system can be recycled in multiple projects, while the remaining 20% can only be recycled in one type of standard floor. Therefore, the aluminum formwork system is suitable for high-standardized high-rise buildings or multi-story buildings. Villa complex. In areas with a high degree of urbanization, the following technical advantages are particularly reflected:
1) The construction period is short. The aluminum formwork system is a quick release mold system. The normal construction of a set of templates can reach four days, and the construction of the line can be better, greatly improving the construction progress and saving management costs.
2) The number of repeated uses is high, and the average use cost is low. The aluminum formwork system adopts aluminum alloy profiles formed by extrusion as raw materials. A set of template specifications can be used over 300 times for overturning. The purchase price of a set of templates spreads out much more than traditional templates.
3) Convenient construction and high efficiency. The aluminum formwork system is simple and convenient to assemble, with an average weight of about 20kg. It is completely handled and assembled by hand. It does not require the assistance of any mechanical equipment. The design of the system is simple, and the speed at which the workers get started and the template turnover speed are very fast. Skilled installation workers can install 20-30 square meters per person per day, which greatly saves labor costs.
4) Good stability and high bearing capacity. The majority of aluminum formwork systems have a bearing capacity of 60KN per square meter, which is sufficient to meet the bearing capacity requirements of most residential buildings.
5) A wide range of applications. The aluminum formwork is suitable for the use of walls, horizontal floors, columns, beams, stairs, window sills, floating boards, etc. It is also useful for secondary structural support such as ring beams, structural columns, and anti-canons.
6) Few joints, high precision, concrete surface effect after the removal of the mold is good. After the aluminum building formwork is demolished, the quality of the concrete surface is smooth and smooth, which basically meets the requirements of the facing and the fair-faced concrete.
7) There is less construction waste on site and the support system is simple. All parts of the aluminum formwork system can be reused. After the mold is removed, there is no garbage on the site. The support system is simple in structure and easy to remove, so the whole construction environment is safe, clean and tidy.
8) Standard and versatile. There are many specifications for aluminum stencils, which can be assembled according to different specifications of the project. When using the used stencils to rebuild new buildings, only need to replace 20 non-standard boards, which can reduce the cost.
9) High recovery value. After scrapping of the aluminum formwork, when the waste disposal value is high, the cost-sharing advantages are obvious.
Contact Us at Any Time